89601EVMC 89600 VSA Cross-Associated EVM

89601EVMC 89600 VSA Cross-Associated EVM

专业级测试测量软件

渠道分销
快速响应

推荐方案套装

面向分析与自动化的软件配置。

分析套件

支持多仪器的离线分析套件。

适用场景: 跨领域分析
关键参数
支持标准通道带宽许可类型
  • 基础许可
  • 多仪器连接支持
  • 离线分析选件
  • 维护计划

* 工程师将进行兼容性核查。

详细规格

89601EVMC 的技术参考

产品概览

Cross-correlation EVM is a technology used to extend the dynamic range of the receiver and improve EVM performance

Two receivers independently capture and demodulate the same signal and cross-correlate the error vectors, thereby canceling out the uncorrelated noise generated by the receivers and significantly reducing EVM

This method makes the cross-correlation EVM value contain only the noise from the device under test (DUT).

The 89601EVMC option with VSA 2022 version 1.0 or later update is able to accurately measure the EVM performance of WLAN signals (WLAN 89601B7RC and/or 89601BHXC license required)

面向最新接口标准的设计与调试,89601EVMC 89600 VSA Cross-Associated EVM 提供行业领先的精度与信号完整性。

为什么选择 Lynshuo?

品质保障

快速交付

专家支持

实验室采购? 联系我们 获取批量教育优惠。

📞